Construction of a new modern production line for switchgear in wind turbines (green field)
for a system supplier in the energy sector
Information on the project
Company:
System supplier in the energy sector
Sector:
Energy / Decarbonization
Task
New product launch of a switchgear for wind turbines. To connect the generated energy to the European grid. As this is a future product for the plant, particular emphasis was placed on a future-oriented assembly line suitable for Industry 4.0.
Result:
- Just-in-time realized production line, as customer order already existed
- Introduction of automated screwdriving technology with cloud connection
- Creation of all workstations with the help of digital twins to ensure EHS requirements
- Introduction of new technologies such as augmented reality worker guidance
- Continuous reduction of assembly times by 50% within 2 years